Introduction
Hydraulic Facilities of the North Main Canal of the Chianan Canal
Length and Location: 24K+600
The Bajhang River Water Diversion Gate is located upstream of the Bajhang River Aqueduct. Its purpose is to regulate upstream and downstream water levels, stabilize water delivery to each branch line, and manage irrigation for different groups. The structure has been rebuilt and is operated by an electric gate. The diversion gate has one gate, measuring 3.65 meters in width and 2.5 meters in height.
Length and Location: 24K+600
The Bajhang River Water Diversion Gate is located upstream of the Bajhang River Aqueduct. Its purpose is to regulate upstream and downstream water levels, stabilize water delivery to each branch line, and manage irrigation for different groups. The structure has been rebuilt and is operated by an electric gate. The diversion gate has one gate, measuring 3.65 meters in width and 2.5 meters in height.