Move to Main Content

Chianan Management Office

Chianan Management Office

:::

No. 2 Sluice Gate

Basic information

  • Recommended location position reference:
  • Management Office:
    Chianan Management Office
Introduction
Hydraulic Facilities of the North Main Canal of the Chianan Canal
Length and Location: 13K+660

The No. 2 Sluice Gate on the South Lateral Canal has three gates, each measuring 1.22 meters wide by 1.02 meters high.

The gates are constructed of stainless steel and use a motorized screw-type transmission mechanism.

The primary function of this sluice gate is to raise the water level of the South Main Canal to facilitate water intake for the Beidaying Sub-lateral Canal and Daying Sub-lateral Canal, which provide water for the Beidaying and Daying irrigation groups in Xinshi District. The combined irrigated area is approximately 216 hectares.
Last Updated:2024-11-04
Top