Move to Main Content

Chianan Management Office

Chianan Management Office

:::

Linfengying Lateral Canal Water Intake

Basic information

  • Recommended location position reference:
  • Management Office:
    Chianan Management Office
Introduction
Hydraulic Facilities of the North Main Canal of the Chianan Canal
Length and Location: 3K+660

The Linfengying Lateral Canal is 5,751 meters long and mainly supplies water for irrigating groups such as Dongfeng under Liujia Station's jurisdiction, with an irrigated area of about 3,005 hectares. The structure was rebuilt in 2019 and adopts rising-stem electric gates. A water level observation well is installed at the starting point.
Last Updated:2024-11-04
Top