Move to Main Content

Chianan Management Office

Chianan Management Office

:::

North Main Canal No. 1 Water Diversion Gate (No. 5 Bridge Water Diversion Gate)

Basic information

  • Recommended location position reference:
  • Management Office:
    Chianan Management Office
Introduction
Hydraulic Facilities of the North Main Canal of the Chianan Canal
Length and Location: 3K+790

This hydraulic structure is the first diversion gate on the North Main Canal of the Chianan Canal, primarily intended to regulate the upstream and downstream water levels and stabilize the water supply to each branch line and irrigation group. The structure was rebuilt in 2010, with four diversion gates measuring 3.6 meters in width and 4 meters in height. The structure adopts rising-stem electric gates.
Last Updated:2024-11-04
Top